#601 moves to version october-2026-window (due Oct 31; Redmine API refuses
start_date on update, recorded in the note), #608 = cgroup_parent wiring
(the gateway starvation fix on 8 vCPU), #609 = Fri 2026-09-04
troubleshooting-only outage with the physical checklist.
💘 Generated with Crush
Assisted-by: Crush:glm-5.2
[#602]
Hardware window #601 slipped to ~Oct 2026: interim fences and daynight
values become the operating config, cpuset reservation defers with it, and
the compose cgroup_parent wiring becomes the gateway starvation fix. Adds
5-activate-multiqueue.sh — the one remaining VM-5111 reboot (human-timed)
to bring the staged net queues live. Tracking/README/crush prefs updated.
💘 Generated with Crush
Assisted-by: Crush:glm-5.2
[#602]
Everything for the ultix-streaming (VM 5111, pfv-tsys5) performance pass:
full report + host audit results, staged/gated configs, guest prep + host
one-shot + post-reboot-fix + netcheck lifecycle scripts, grow-root manual
runbook, rolling tracking HUD, questions v1, and the gateway boot-race
hardening units. Applied and verified live 2026-08-31; open work is
tracked in Redmine project 55 as #601-#607. [#602]
💘 Generated with Crush
Assisted-by: Crush:glm-5.2