docs sync post-pass: REPORT v1.1 status, Oct replan runbook, repo path fix
REPORT.md gets a post-pass status banner + per-item STATUS tags + phase/QM checklist truth; RUNBOOK-TODAY amended for the Oct window replan (Friday is troubleshooting-only #609); all ~/optimize paths updated after the repo move to ~/projects/ultix. Adds the 22:00 night-flip watcher log and 6-remove-agent-stacks.sh (boot-time screen/crush relauncher teardown with backups to removed-agent-stacks/). 💘 Generated with Crush Assisted-by: Crush:glm-5.2 [#602]
This commit is contained in:
Reference in New Issue
Block a user