docs sync post-pass: REPORT v1.1 status, Oct replan runbook, repo path fix
REPORT.md gets a post-pass status banner + per-item STATUS tags + phase/QM checklist truth; RUNBOOK-TODAY amended for the Oct window replan (Friday is troubleshooting-only #609); all ~/optimize paths updated after the repo move to ~/projects/ultix. Adds the 22:00 night-flip watcher log and 6-remove-agent-stacks.sh (boot-time screen/crush relauncher teardown with backups to removed-agent-stacks/). 💘 Generated with Crush Assisted-by: Crush:glm-5.2 [#602]
This commit is contained in:
@@ -1,6 +1,6 @@
|
||||
#!/usr/bin/env bash
|
||||
# Post-reboot validation fallout (2026-08-31). Run with sudo, once:
|
||||
# sudo ~/optimize/3-post-reboot-fixes.sh
|
||||
# sudo ~/projects/ultix/3-post-reboot-fixes.sh
|
||||
# 1. Installs ethtool + enables virtio multiqueue (host side now offers
|
||||
# 4 queues on ens18, 2 on ens19; the guest defaults to 1 until told).
|
||||
# 2. Installs the gateway ensure-up unit (prod boot race on the tailscale-IP
|
||||
|
||||
Reference in New Issue
Block a user