@@ -96,3 +96,4 @@
2026-08-29T07:13:36-05:00 | PMO | Charles re-sent Phase3->Prod directive: moves already live (Prod=21 open, Phase3=0); residual confusion = empty Phase 3 version header on roadmap -> closed version 37 via one-time python (204); mred gap (no version update) filed as 524 @Beta
2026-08-29T07:16:11-05:00 | PMO | 506 closed Done via mred (accepted); wake-q14 fuse killed (fired-purpose served); teardown ETA ~09:30 CST given q15 pace (B4 green 07:15, container+REPORT remaining) then q16
2026-08-29T07:22:01-05:00 | PMO | Charles: 0800 = SOFT deadline; work to prod ALL DAY (fast/quality/cost/parallel), wiring tonight 1900. 0758 hard-stop killed; 0745 cutover checkpoint + 0900 chain check armed; heartbeat 1h continues. q16 stays serial-behind-q15 (same repo); 522 inherited by loop if q16 slips
2026-08-29T07:50:23-05:00 | PMO | CUTOVER COMPLETE: q15 verified (REPORT 07:32, tests green, live proof) -> 521 Resolved. Scope->Beta(35) + max_rounds 12 applied, container restarted healthy, 5 Beta tasks in scope, first loop-driven Beta turn (524) RUNNING on flash. 497 parked In Progress (1900 wiring). 523: criteria 1/2/4 PASS, 3=teardown pending. q15's worker had requeued 523 itself to proof the container (benign mystery solved). Remaining crush work: teardown after 522/495 land or fail-verify