pmo: 0800 soft per Charles — run to prod all day, teardown when self-sustaining
This commit is contained in:
@@ -95,3 +95,4 @@
|
||||
2026-08-29T07:12:13-05:00 | PMO | Charles callout fixed: Alpha roadmap lied (518-520 closed => 100% while dev.sh screen still wraps attached docker run --rm, no restart policy, crush still driving). Filed 523 Alpha exit gate (Infrastructure, Immediate, due today) w/ acceptance: restart-policy container, dev.sh screen dead, crush screens retired, autonomy proof; 521 blocks 523; Alpha now truthfully 3/4 open-1
|
||||
2026-08-29T07:13:36-05:00 | PMO | Charles re-sent Phase3->Prod directive: moves already live (Prod=21 open, Phase3=0); residual confusion = empty Phase 3 version header on roadmap -> closed version 37 via one-time python (204); mred gap (no version update) filed as 524 @Beta
|
||||
2026-08-29T07:16:11-05:00 | PMO | 506 closed Done via mred (accepted); wake-q14 fuse killed (fired-purpose served); teardown ETA ~09:30 CST given q15 pace (B4 green 07:15, container+REPORT remaining) then q16
|
||||
2026-08-29T07:22:01-05:00 | PMO | Charles: 0800 = SOFT deadline; work to prod ALL DAY (fast/quality/cost/parallel), wiring tonight 1900. 0758 hard-stop killed; 0745 cutover checkpoint + 0900 chain check armed; heartbeat 1h continues. q16 stays serial-behind-q15 (same repo); 522 inherited by loop if q16 slips
|
||||
|
||||
@@ -82,3 +82,7 @@ harness: intake: 1 task(s) in redmine scope
|
||||
harness: loop: scan: 1 task(s) in scope, 1 new/updated
|
||||
harness: loop: dispatch 523 (updated 2026-08-29T07:11:58-05:00): "Alpha exit gate: containerized loop daemon (restart policy) replaces dev.sh screen; crush/screens retired"
|
||||
harness: task 523 (redmine): "Alpha exit gate: containerized loop daemon (restart policy) replaces dev.sh screen; crush/screens retired" class=study -> mopac-study -> glm-4.7-flash
|
||||
harness: REPORT reports/REPORT-demo-523-20260829-121914.md
|
||||
harness: loop: status New -> Resolved on #523
|
||||
harness: loop: noted REPORT on #523
|
||||
harness: loop: stopped
|
||||
|
||||
@@ -1 +1 @@
|
||||
Now Part B1 — file tools. Checking the llm tool types:Writing the file tools test first (TDD red):Now the implementation:File tools green. Now wiring config `[tools.files]` + `[loop] turn_timeout_secs` (TDD):Now the config implementation:Now the conductor wiring. Checking writeback render for empty content handling:Writing loop tests for file tools, timeout, and e2e turn (TDD red):Now wire the conductor (loop.go):Now runTurn timeout handling + execTool dispatch:All three failures are the expected red. Fixing: unknown-tool counts as denial, double-%w wrapping, and extending the shipped allow-list:Now extend the shipped allow-list in both example and live config:All green. Now B4 — end-to-end fake-Redmine turn test + status-file heartbeat tests:Now implement the heartbeat in daemon.go:Now wire hb into the Conductor struct and daemon flow:All green. Updating example + live config docs:Committing Part B:
|
||||
Now Part B1 — file tools. Checking the llm tool types:Writing the file tools test first (TDD red):Now the implementation:File tools green. Now wiring config `[tools.files]` + `[loop] turn_timeout_secs` (TDD):Now the config implementation:Now the conductor wiring. Checking writeback render for empty content handling:Writing loop tests for file tools, timeout, and e2e turn (TDD red):Now wire the conductor (loop.go):Now runTurn timeout handling + execTool dispatch:All three failures are the expected red. Fixing: unknown-tool counts as denial, double-%w wrapping, and extending the shipped allow-list:Now extend the shipped allow-list in both example and live config:All green. Now B4 — end-to-end fake-Redmine turn test + status-file heartbeat tests:Now implement the heartbeat in daemon.go:Now wire hb into the Conductor struct and daemon flow:All green. Updating example + live config docs:Committing Part B:Part B committed. Now Part A — runtime container. Getting the alpine digest and checking tea credentials:Alpine digest pinned. Checking current loop activity before cutover, and the live vertical:Task 523 (the exit gate ticket) is mid-turn in the old container — I'll let it finish while preparing files. Writing Dockerfile.runtime and compose.yaml:Now build the release binary and the runtime image:Task 523 done, queue idle. Cutting over — stop the old dev.sh container, start the compose service:Host uid is 1001, not 1000. Fixing compose:
|
||||
Reference in New Issue
Block a user