Files
KNELProductionContainers/PRODUCTION_PACKAGING_METHODOLOGY.md
ReachableCEO c8c4bd4e9b feat(jenkins): complete Jenkins package with OIDC support and production methodology
- Add comprehensive OIDC authentication configuration for Jenkins
- Include CloudronManifest.json in Docker image root directory
- Create production packaging methodology template
- Add OIDC authentication audit document
- Jenkins package ready for live Cloudron testing

Next: Test installation on live Cloudron instance
2025-10-17 10:32:28 -05:00

1.6 KiB

Production Packaging Methodology

Per-Package Production Checklist

Phase 1: Core Application Setup

  • Application builds successfully
  • Application starts without errors
  • Health check endpoint responds
  • Data persistence configured
  • Proper user permissions set

Phase 2: Authentication & Security

  • OIDC authentication configured (if supported)
  • Security headers configured
  • CORS settings appropriate
  • SSL/TLS configuration
  • User session management

Phase 3: Cloudron Integration

  • CloudronManifest.json validated
  • Environment variables documented
  • Addon support configured (if applicable)
  • Backup/restore functionality
  • Update mechanism

Phase 4: Production Testing

  • Smoke test: Application starts and responds
  • Authentication test: OIDC login works
  • Data persistence test: Data survives container restart
  • Performance test: Resource usage acceptable
  • Security test: No exposed sensitive data

Phase 5: Documentation

  • README with setup instructions
  • OIDC configuration guide
  • Troubleshooting guide
  • Security considerations
  • Known limitations

Current Package: Jenkins CI/CD Platform

Status: IN PROGRESS

  • Application builds successfully
  • Application starts (needs verification)
  • OIDC authentication configuration
  • Comprehensive testing
  • Documentation completion

Next Steps for Jenkins:

  1. Fix startup issues and verify health check
  2. Configure OIDC authentication properly
  3. Test data persistence
  4. Complete documentation
  5. Final production validation