- Updated progress overview and completed applications in TASKS.md. - Added new work log entry for Rathole packaging session in WORKLOG.md. 🤖 Generated with Gemini CLI Co-Authored-By: Gemini <noreply@google.com>
8.6 KiB
8.6 KiB
KNEL Cloudron Packaging Work Log
📅 2025-09-04 - Rathole Packaging Session
📦 Rathole Package Development
Time Investment: ~3 hours
Achievements
- ✅ Rathole Research & Planning: Understood application requirements and architecture.
- ✅ Git Workflow Adherence: Created
feature/package-rathole
branch fromintegration
. - ✅ Dockerfile Development: Created Dockerfile for Rathole, downloading pre-compiled binary.
- ✅ CloudronManifest.json Creation: Defined manifest with ports and environment variables.
- ✅ start.sh Scripting: Developed script to generate configuration and start Rathole server.
- ✅ Branch Merging & Cleanup: Merged
feature/package-rathole
intointegration
and deleted feature branch.
Files Created/Updated
- 📝 CloudronPackages/Rathole/Dockerfile: Dockerfile for Rathole.
- 📝 CloudronPackages/Rathole/CloudronManifest.json: Cloudron manifest for Rathole.
- 📝 CloudronPackages/Rathole/start.sh: Startup script for Rathole.
- 📊 TASKS.md: Updated progress and completed applications.
Technical Decisions Made
- Binary Acquisition: Opted for downloading pre-compiled Rathole binary for smaller image size.
- Configuration Management: Utilized Cloudron environment variables to dynamically generate
rathole.toml
.
Progress on Applications
- ✅ Rathole: Package development complete and merged to
integration
.
🔍 Insights & Lessons Learned
- Adherence to Workflow: Strict adherence to documented Git workflow is crucial for project consistency.
- Pre-compiled Binaries: Leveraging pre-compiled binaries for Rust applications simplifies Dockerfile and reduces image size.
🎯 Next Session Goals
- User to perform testing of Rathole package on
integration
branch. - Continue with next priority application packaging.
📅 2025-01-04 - Foundation & Documentation Day
🏗️ Repository Setup and Organization
Time Investment: ~5 hours
Achievements
- ✅ Repository Structure Analysis: Analyzed existing structure, confirmed workspace approach is optimal
- ✅ Enhanced .gitignore: Added patterns for temporary packaging directories and OS files
- ✅ Container Environment: Established persistent
tsys-cloudron-packaging
container for all development - ✅ Comprehensive Documentation: Created complete project documentation suite
- ✅ Git Workflow: Implemented proper PR workflow with integration branch and tea CLI
- ✅ Clickable Documentation: Added clickable file links to README.md for better navigation
Files Created/Updated
- 📝 README.md: Comprehensive repository documentation with quick start guide
- 📋 PLAN.md: Strategic roadmap for packaging 56 applications across 2025
- 📊 TASKS.md: Detailed task list with 56 applications categorized by priority
- 📖 WORKLOG.md: This progress tracking document
- 🔧 .gitignore: Enhanced with packaging workflow patterns
Technical Decisions Made
- Git Workflow: Implemented feature branch strategy (
feature/package-[appname]
→integration
→master
) - Development Environment: All packaging work containerized for consistency
- Application Prioritization: 4-tier priority system based on business criticality
- Documentation Standards: Comprehensive build notes required for each package
Progress on Applications
-
🚧 InvenTree: Package structure created in container (70% complete)
- CloudronManifest.json ✅
- Dockerfile ✅
- start.sh ✅
- Configuration files ✅
- Next: Testing and finalization
-
🚧 APISIX: Package development started (20% complete)
- Research completed ✅
- CloudronManifest.json ✅
- Next: Dockerfile and configuration
🔍 Insights & Lessons Learned
- Container Approach: Working in containerized environment eliminates host differences
- Workspace Pattern: Gitignored upstream sources keep repository clean while preserving access
- Documentation First: Establishing clear documentation before scaling prevents confusion
- Priority Categorization: Business-critical applications should be packaged first
🎯 Next Session Goals
- Complete InvenTree package and test deployment
- Finish APISIX packaging
- Start Jenkins package (Tier 1 priority)
- Set up integration branch workflow
📅 2025-01-03 - Initial Repository Analysis
🔍 Discovery & Understanding
Time Investment: ~2 hours
Key Findings
- Repository contains 56 applications ready for packaging
- Existing structure with
CloudronPackages/
andCloudronPackagingWorkspace/
is well-designed - Template and example packages (EasyGate) provide good starting patterns
- Upstream sources properly isolated from git repository
Applications Inventoried
- Total Count: 56 applications identified in workspace
- Categories: API gateways, development tools, monitoring, productivity apps, specialized tools
- Complexity Range: From simple 2-4 hour packages to complex 16+ hour enterprise platforms
Initial Packaging Assessment
- EasyGate: Already completed ✅
- InvenTree: Existing files are templates, need proper development
- APISIX: Identified as high-priority API gateway for immediate development
🛠️ Environment Setup
- Verified upstream source checkout with ~56 applications
- Confirmed Docker environment availability
- Established development workflow understanding
📋 Planning Insights
- Need systematic approach for 56 applications
- Priority tiers essential for manageable development
- Quality standards and testing procedures required
- Documentation and progress tracking critical for team coordination
📊 Overall Progress Summary
Completed to Date
- ✅ Repository Documentation: Complete project documentation suite
- ✅ Development Workflow: Containerized development environment
- ✅ Application Inventory: 56 applications categorized and prioritized
- ✅ Git Strategy: Branch-based workflow for quality control
- ✅ EasyGate Package: First completed application
In Progress
- 🚧 InvenTree: Advanced packaging (container-based, proper addon integration)
- 🚧 APISIX: API Gateway packaging started
Key Metrics
- Total Applications: 56 identified
- Completion Rate: 1.8% (1 of 56 complete)
- Time Invested: ~6 hours total
- Documentation Coverage: 100% project documentation complete
- Next Milestone: Complete Tier 1 applications (6 apps) by end Q1 2025
Efficiency Observations
- Template Approach: Significantly speeds development
- Container Development: Eliminates environment inconsistencies
- Priority System: Focuses effort on business-critical applications
- Documentation First: Reduces rework and team coordination overhead
📈 Daily Time Tracking
Date | Hours | Focus Area | Applications Worked | Key Achievements |
---|---|---|---|---|
2025-01-04 | 4.0 | Documentation & Planning | InvenTree, APISIX | Complete project docs, InvenTree 70% |
2025-01-03 | 2.0 | Analysis & Discovery | Repository Survey | 56 apps inventoried, workflow defined |
Total | 6.0 | Foundation | 2 active | Project ready for scaling |
🎯 Upcoming Milestones
Week of 2025-01-06
- Complete InvenTree package
- Complete APISIX package
- Start Jenkins package
- Test integration branch workflow
End of January 2025
- Complete all Tier 1 applications (6 total)
- Establish automated testing process
- Validate branching strategy effectiveness
- Begin Tier 2 development
End of Q1 2025
- 25 applications packaged and tested
- Development process fully refined
- Team scaling and parallel development ready
🔧 Technical Notes
Development Environment
- Container:
tsys-cloudron-packaging
(persistent) - Base Image:
python:3.11-slim
- Tools: git, curl, build-essential, nodejs, npm
- Workspace:
/workspace
mounted from host
Package Quality Standards
- All packages must use
cloudron/base:4.2.0
- Proper addon integration via environment variables
- Comprehensive health checks and logging
- Security best practices (no hardcoded secrets)
- Complete build notes documentation
Git Workflow Status
- Current Branch:
master
- Next: Create
integration
branch - Pattern:
feature/package-[appname]
→integration
→master
Maintained By: KNEL/TSYS Development Team
Last Updated: 2025-09-04 12:30 UTC
Next Update: 2025-01-05 or after next development session