4 Commits
Author SHA1 Message Date
mrcharles f815149472 Repo tidy: logs consolidated, 15/16 scripts tracked, docs synced (#615/#611/#603)
Run outputs moved to logs/ (incl. sda partition-table backup). New from
the 15:57-16:03 parallel session: 16-grow-root-online.sh (RAN: / = 431G
online, swap removed by design — GROW-ROOT-RUNBOOK superseded) and
15-docker-to-data2.sh (staged, not run). README/NEXT/RUNBOOK/REBUILD
reflect current reality. Moot rdp-testprep timer removed from the VM.

Details: https://projects.knownelement.com/issues/615
2026-09-01 17:17:10 -05:00
mrcharles 46fe0cb6a5 Rebuild runbook + state capture + docs sync to current reality (#615)
REBUILD.md maps a full rebuild (PVE qm spec incl. nested-virt flag,
guest OS/accounts/dotfiles bootstrap, script order, package baseline,
verification checklist). 14-capture-state.sh regenerates docs/state
snapshots (guest apt/units/sysctl/fstab/docker + PVE 5111 config).
Docs sync: stale multiqueue-owed text removed from NEXT/REPORT/RUNBOOK;
README script list + open-work list current.

Details: https://projects.knownelement.com/issues/615
2026-09-01 13:31:38 -05:00
mrcharles 74934b1095 docs sync post-pass: REPORT v1.1 status, Oct replan runbook, repo path fix
REPORT.md gets a post-pass status banner + per-item STATUS tags + phase/QM
checklist truth; RUNBOOK-TODAY amended for the Oct window replan (Friday is
troubleshooting-only #609); all ~/optimize paths updated after the repo move
to ~/projects/ultix. Adds the 22:00 night-flip watcher log and
6-remove-agent-stacks.sh (boot-time screen/crush relauncher teardown with
backups to removed-agent-stacks/).

💘 Generated with Crush

Assisted-by: Crush:glm-5.2
[#602]
2026-08-31 21:55:48 -05:00
mrcharles cba2a64d67 ultix perf/ops workbench: complete 2026-08-31 optimization pass for VM 5111
Everything for the ultix-streaming (VM 5111, pfv-tsys5) performance pass:
full report + host audit results, staged/gated configs, guest prep + host
one-shot + post-reboot-fix + netcheck lifecycle scripts, grow-root manual
runbook, rolling tracking HUD, questions v1, and the gateway boot-race
hardening units. Applied and verified live 2026-08-31; open work is
tracked in Redmine project 55 as #601-#607. [#602]

💘 Generated with Crush

Assisted-by: Crush:glm-5.2
2026-08-31 16:46:13 -05:00