TASK: keyproxy-v0 finish — commit, push, report (turn was self-killed)

Context

The keyproxy-v0 turn completed the implementation but self-terminated (SIGTERM via its own broad pkill while restarting the smoke server) right before committing. Everything sits UNCOMMITTED in the working tree of ~/projects/meta/MOPAC/keyproxy (README.md modified; cmd/ internal/ Makefile dev.sh go.mod keyproxy.toml.example .gitignore untracked). Its log (per PMO read): tests were green, docker smoke 10/10 PASS, live 401/200/400 verified, README quickstart verified verbatim.

Steps

  1. Read the working tree (code + README + example config). Confirm it matches the v0 TASK spec (file/env backends, bitwarden/vault stubs, auth, redaction, no persistence, no admin UI).
  2. Re-verify: make test (or equivalent) inside the digest-pinned golang:1.26 Docker builder — ALL DEV IN DOCKER, no host toolchain. Fix anything that fails; keep changes minimal.
  3. Commit in logical chunks (backend interface + parsers, config, server, cmd/CLI, build tooling + docs) with clear messages.
  4. Push to origin main (ukrrs/mopac-keyproxy; default branch is main — clone is already on it).
  5. NEVER use a broad pkill. If you must stop a server process, kill the exact PID you spawned (save $!), never pattern-match.
  6. Seed nothing else; real config/keyproxy.toml stays gitignored.

Deliverable

REPORT-20260828-2130-keyproxy-v0.md in ~/.coordinate/inbox-pmo/: what shipped (endpoints, backends, ref map), test results, the commit hashes, how to start it (README quickstart already written — just cite), and anything left for phase 3 (bitwarden/vault stubs status).