ops(archive): TASK prompts and REPORT verifications, studies through V1
This commit is contained in:
@@ -0,0 +1,7 @@
|
||||
# REPORT — study-crush (PMO verification, 2026-08-28)
|
||||
|
||||
- Deliverable: /home/reachableceo/projects/meta/MOPAC/harness/docs/PORTING-NOTES-crush.md
|
||||
- Covers: crush internals — MCP via go-sdk, session model, skip-list, exposure-minimization protocol (env/VAR indirection, redaction, canonical-source regeneration).
|
||||
- PMO-verified: file exists; committed (a606810) and pushed to ukrrs/MOPAC on main.
|
||||
- Redmine issue 480 (Study crush internals) set to status_id 3 (closed) with journal note.
|
||||
- STATUS: DONE.
|
||||
Reference in New Issue
Block a user