pmo: FINAL — self-hosted teardown; loop sole worker; 0900-ready

This commit is contained in:
2026-08-29 18:44:19 -05:00
parent 7debb52c97
commit 74ca1ed4a2
13 changed files with 469 additions and 0 deletions
+1
View File
@@ -110,3 +110,4 @@
2026-08-29T16:37:29-05:00 | PMO | 100%-DONE-BY-0900 checklist (auditable): [1] lanes 508/511/507/501 verified+closed [2] loop lands 528 pool + 530 claiming, both verified [3] order-overnight-queue.sh bumps (492/493 first) [4] container restart @safe boundary ([brief] live) [5] teardown-stack.sh (self-hosted; 523 closed, SMS queued, snapshot, PMO last) [6] loop grinds overnight solo (park-on-failure self-heal) [7] 0630 brief on 495 [8] 0900: fleet bundle + scripts/fleet runbook staged, ONLY waiting on Charles wiring (TSGCOO first). Residual risks logged: overnight verify=loop-only per architecture; bash 60s cap on dev.sh check (turns adapt); 496 review chain may not finish (biggest)
2026-08-29T17:08:07-05:00 | PMO | wake-1730 premature (q19 4min in, lanes turning) -> re-armed wake-1845 with full final sequence. q19 healthy start (discounted empty reports, mapping code, bg baseline check)
2026-08-29T18:04:14-05:00 | PMO | 531 ANSWERED (PG-as-queue design yes + scaled shape; PGQ filed 532 @Phase4 due 9/30, rel 492); Phase 4 version created; 530 CLOSED (pool+claim verified, fleet gate PASSED); rest-lane hung 100min -> killed, 511 requeued to loop; 516/517/492/493/515 unparked; loop grinding 512 mid-turn
2026-08-29T18:44:18-05:00 | PMO | FINAL: 100%-done-0900 checklist executed — lanes verified+closed+archived (501/507/508/530), false-resolves swept+refed (497/502), 531 design answered (532 PG queue filed @Phase4), pool=2 live, [brief] live, loop dispatched 532 (PG queue) as first overnight turn. TEARDOWN NOW — self-hosted. Waiting on Charles 0900: wiring TSGCOO, BW creds, postfix, then migration. Iterate via Redmine (OPERATIONS.md = the manual)