mrcharles bfb2d44183 docs(audit): RAM/CPU placement audit + codify capacity goals
Add CAPACITY-GOALS.md (80% RAM / ~50% idle CPU targets + workload placement
model) and AUDIT-2026-07-29.md (live end-to-end analysis of all 7 hosts). Key
findings: memory goal met fleet-wide (highest 72%); CPU idles 0-6% (chase via
workloads, not hardware); tsys5 is single-CPU not dual; cnode4/5 are stale
running VMs. Answers the wnode-sizing question (grow tsys9, not tsys1), confirms
tsys6/7 for RackRental, and gives a DDR3 compatibility decision tree (RDIMM-only
servers reject consumer UDIMM). Refreshed STATUS/docmap and the returned audit
logs, and fixed an empty-array abort in deploy-check.sh.

💘 Generated with Crush

Assisted-by: Crush:glm-5.2
2026-07-29 05:32:12 -05:00

131 lines
6.0 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
# Capacity & Sizing Goals
**Date:** 2026-07-29
**Status:** Authoritative. These are the operator's standing targets. Every
fleet audit and VM-placement decision is evaluated against them.
> Companion to [`AUDIT-2026-07-29.md`](AUDIT-2026-07-29.md) (the current
> placement analysis) and [`PROJECT.md`](PROJECT.md) (the fleet hardware report).
---
## 1. Memory target: 80% steady-state
**Rule:** Keep each node at or below **80% physical RAM utilization at steady
state.** Occasional bursts above 80% are acceptable (that is what swap is for);
the *sustained* idle-to-average load must sit at ~80% or below.
**Two metrics must both be tracked:**
| Metric | Definition | Target |
|--------|-----------|--------|
| **Actual usage** | `MemTotal - MemAvailable` from `/proc/meminfo` | **≤ 80%** steady state (the real rule) |
| **Allocation commitment** | sum of running-VM `memory:` vs host RAM | planning ceiling — keep < 100% where possible |
**Why both:** KSM (same-page merging) and virtio-balloon mean *actual* usage is
often well below the sum of VM allocations (e.g. tsys1 allocates 115% but uses
72% actual). Actual usage is the steady-state truth; allocation is the
worst-case ceiling if every VM suddenly fills its reservation. A host is
"healthy" when actual ≤ 80% **and** allocation isn't so far over 100% that a
balloon-deflate storm could OOM it.
**Tolerance:** brief actual spikes to 90-100% are fine. Persistent swap use
(>~1 GB on a steady basis) means the host is over-committed and VMs should
migrate off.
## 2. CPU target: ~50% utilization at idle
**Rule:** Ideally, nodes sit around **50% CPU utilization at idle.**
This is a *utilization* goal, not a headroom goal. The fleet is
**CPU-underutilized** (most hosts idle at 0-6%). On a shoestring budget, idle
silicon is wasted investment and (for the PowerEdge hosts) wasted electricity.
The intent is to **pack workloads** so the baseline load consumes roughly half
the compute, reserving the other half for bursts.
**Practical implications:**
- The older, power-hungry hosts (tsys6 Nehalem, tsys5 Westmere) should either be
doing useful work at ~50% or be candidates to power down / solar-gate when
idle. Running them at 0-6% wastes power per core.
- The newer, efficient hosts (tsys9 Comet Lake, tsys3 Skylake) are cheap to run
idle and are the natural home for always-on control-plane + infra.
- vCPU overcommit is fine for idle workloads; the 50% target is about *actual*
utilization, not vCPU ratios.
## 3. Workload placement model
The fleet serves three distinct workload families. Placement should follow CPU
quality + storage speed + RAM size, in that order of relevance per family.
### 3.1 ETL / HPC / cross-compile (CPU + storage bound)
Large geospatial/weather ETL, RTL/firmware simulation, cross-compile pipelines.
**Needs high IPC (modern cores) + fast storage (SSD/NVMe).** RAM is moderate
(8-32 GB per job).
| Host | CPU | Storage | Fit |
|------|-----|---------|-----|
| **tsys9** | i5-10500 Comet Lake (2020) — **best IPC in fleet** | local SSD (PNY CS900) | **Primary compute node** |
| **tsys3** | Xeon E3-1535M v5 Skylake (2015) | local NVMe (Samsung PM961) | **Fast compute node** |
| tsys2 (incoming) | i7-7820HQ Kaby Lake (2017) | NVMe 960 PRO + SSD 850 EVO | **Fast compute node** (post-rebuild) |
These three hosts have the newest CPUs and the only fast local storage. Their
wnodes should be the **compute-tier** workers, sized larger (more cores/RAM) and
labeled `workload=compute`.
### 3.2 RackRental.net — network labs on demand (RAM + IOPS bound, CPU-light)
Business idea: rent out ephemeral network labs (containerlab topologies) on
demand. Many containers / network namespaces, short-lived, mostly idle once up.
**Needs massive RAM + fast container-image pulls. CPU quality is secondary**
(labs are idle between keystrokes).
| Host | CPU | RAM | Fit |
|------|-----|-----|-----|
| **tsys7** | 2× E5-2630 v2 Ivy Bridge (2013), 24 threads | **189 GB** | **Primary RackRental host** |
| **tsys6** | 2× E5530 Nehalem (2009), 16 threads | **126 GB** | **Secondary RackRental host** |
**Verdict: tsys6/7 are the correct RackRental hosts.** Their weak CPUs are
irrelevant for idle network labs; their RAM is unmatched. Their wnodes should be
labeled `workload=rackrental`.
**Caveat (deferred):** their local-lvm is USB 2.0 portable HDD (~30 MB/s), which
is terrible for container image pulls. This is a *disk* problem, not a RAM/CPU
problem, and is deferred to the post-Friday storage-class work. RAM-wise they are
ready today.
### 3.3 Infrastructure + k8s control plane (always-on, low resource)
netinfra, UCS, LibreNMS, SIEM, tailscale-router, PBS, k3s cnodes. Lightweight,
must stay up. Lives on tsys1 + tsys9 (and the cnodes spread across hosts for
etcd diversity).
---
## 4. Host role summary (target)
| Host | CPU era | RAM | Primary role | Wnode class |
|------|---------|-----|--------------|-------------|
| tsys1 | Haswell 2013 | 32 GB (maxed) | Infra + control plane | light (4c/4G) |
| tsys2 | Kaby Lake 2017 | 32 GB | Compute (incoming) | compute |
| tsys3 | Skylake 2015 | 32 GB | Compute | compute |
| tsys4 | Haswell 2013 | 16 GB | Storage (NFS + PBS) | — |
| tsys5 | Westmere 2010 | 96 GB | Storage + fast-tier hub | compute (NVMe, post-Friday) |
| tsys6 | Nehalem 2009 | 126 GB | RackRental | rackrental |
| tsys7 | Ivy Bridge 2013 | 189 GB | RackRental | rackrental |
| tsys9 | Comet Lake 2020 | 24 GB | Infra + control plane + compute | compute (growable) |
## 5. DDR3 memory policy
**Do not blindly add RAM to tsys6/7.** They idle at 6%/9% actual usage with
117/171 GB free — they are RAM-saturated in the wrong direction (over-provisioned,
not starved). The fleet's RAM pressure is on the *infra* hosts (tsys1/5/9
over-allocated), and that is solved by **migrating VMs** to tsys6/7's existing
free RAM, not by installing sticks.
Compatibility is decisive and is documented per-host in
[`AUDIT-2026-07-29.md`](AUDIT-2026-07-29.md) §5. Short version: tsys5/6/7 require
**Registered ECC (RDIMM)**; only RDIMM sticks will POST. Consumer UDIMM
(Patriot / most Kingston) fits essentially nowhere useful here.