docs(status): record operator schedule + remote vs onsite work split

Operator onsite Monday 0700. Until then: software/docs/OAM only (Sunday
off). Switch changes + physical cable work deferred to Monday onsite.

💘 Generated with Crush

Assisted-by: Crush:glm-5.2
This commit is contained in:
2026-07-30 23:03:48 -05:00
parent 24b08aa592
commit cd1c2f7332
+7
View File
@@ -171,6 +171,13 @@ infrastructure, Proxmox cluster ops, and k8s control plane.
- Audit VM cache modes (writethrough → writeback for NFS)
**Other:**
- **Schedule:** Operator onsite Monday 0700. Until then: software fixes,
documentation, and OAM only (no physical access). Sunday off. Saturday =
OAM Day (2026-08-01).
- **Remote-capable (nowSaturday):** tsys5 NVMe/SSD mount+config, fleet tuning
(tsys4/5 nconnect/bond hash/rmem), VM config audit, OAM Day prep, documentation
- **Onsite-only (Monday+):** switch config changes (core-sw01 ch1 hash+member,
tor3-stor LACP conversion), tsys5 2nd ethernet cable, physical hardware work
- **Saturday OAM Day (2026-08-01):** 100% instrumentation coverage — Beszel
(metrics) on all hosts, Uptime Kuma (up/down) → Pushover alerts, LibreNMS
(SNMP) for switches, Home Assistant (power/temp) for physical infra,