ercot-brief.sh: LZ_SOUTH RTM now + 24h peak -> GREEN/WATCH/ELEVATED/CRITICAL risk level + actions (precharge battery, defer class-3 batch, RTW counterfactual flag) + TSV history. Rationale: Base Power stays the retail counterparty; ISO signals are risk intelligence, not an export market. https://projects.knownelement.com/issues/826#note-7
3.6 KiB
ONCOR real-time arbitrage: sell to Base Power vs serve load
Status: v1 (2026-09-06, #826). Location: Pflugerville, Travis County, TX —
ONCOR wires, ERCOT South load zone (LZ_SOUTH). Tool:
solar-analysis/oncor-arbitrage.sh.
The plan facts that shape everything
Base Power (verified 2026-09-06):
- Import: $0.085/kWh flat (contract through Oct 2028)
- Export: $0.040/kWh flat solar credit — Base does NOT pay real-time wholesale for exports
So on Base Power, both sides of your meter are flat rates. ERCOT's real-time market price (RTM, 15-min settlement point prices) does not change what you pay or earn today — it is a counterfactual and a planning signal:
Decision rules (what the tool emits)
For each kWh of solar surplus, best action = max of:
| option | value | when it wins |
|---|---|---|
| serve own/deferrable load | $0.085 avoided | almost always (8.5¢ > 4¢) |
| export to Base | $0.040 flat | only when NO deferrable load exists |
| export on an RTW plan* | RTM $/kWh | only when RTM > $0.085 (rare spikes) |
*counterfactual — would require switching export credit to a real-time- wholesale retailer plan (e.g. Octopus-style RTW). Texas RTW export averages ~2¢/kWh with rare spikes >$5/kWh — as a steady diet it LOSES to Base's flat 4¢; it only wins if you can time exports into spikes (needs battery).
Practical rules:
- Every surplus kWh has a home: load first. HFNOC batch compute, site-2 deferrable manufacturing, battery charging — all displace 8.5¢ power. This is why the KNELPerf class-3 batch gate keys on solar surplus.
- Only truly surplus-after-load gets exported at 4¢.
- RTM spike alerts (
rtw_would_beat_self_consume: true, RTM > $85/MWh): under a future RTW plan you'd earn more exporting than self-consuming. Track how often this happens; if frequent and clustered, an RTW plan + battery beats Base's flat buyback for exports. Until then, staying on Base and self-consuming is strictly better. - Battery note: Base's free battery — verify who controls dispatch (Base dispatches it for grid services; if they own the dispatch, do not count it in household arbitrage). Open question logged on #826.
Price sources
Official API (api.ercot.com public API) and gridstatus.io both require a
free API key; ercot.com's dashboard JSON is behind an Imperva bot-wall
(tested 2026-09-06). Tool source precedence: RTM_OVERRIDE →
GRIDSTATUS_API_KEY → ERCOT_API_KEY → cache file. Key registration is a
founder action ( NeedsInput on #826).
KNELPerf integration
oncor-arbitrage.sh emits start_deferrable_load + rtw_would_beat_self_consume
as JSON — the batch launcher consumes this plus the HA solar-surplus sensor
once the plant is live. Docs: KNELPerf docs/ARCHITECTURE.md §7-8.
Docs live on Discourse — this repo is the executable source of truth.
Day-to-day ISO risk intelligence (ercot-brief.sh)
Founder ruling 2026-09-06: Base Power must remain the retail provider (no direct ERCOT interconnection). So the ISO's signals are RISK INTELLIGENCE, not an export market:
ercot-brief.shproduces a daily risk level from LZ_SOUTH RTM (now + 24h peak): GREEN (<$150/MWh) / WATCH (>=150) / ELEVATED (>=500) / CRITICAL (>=2000, adders/EEA territory).- Actions it emits: precharge battery (WATCH+), defer class-3 batch load (ELEVATED+), rtw_counterfactual_flag (RTM > $85).
- On EEA-watch days expect Base to dispatch the fleet battery and expect RTW-plan counterfactual spikes — history TSV accumulates for trend stats.
- Same source chain as the arbitrage tool (GRIDSTATUS_API_KEY / ERCOT_API_KEY / override — key registration still pending, see #826/#827).