Commit Graph

8 Commits

Author SHA1 Message Date
John Hill
6ce340cebd
[e2e] Update remaining tests and add missing comparison coverage (#7363) 2024-01-11 14:47:00 -08:00
Jesse Mazzella
3ff2f029eb
chore: update copyright end year to 2024 (#7364) 2024-01-09 13:31:51 -08:00
Tristan F
fce98a1c47
refactor: migrate to ESM (#7331)
* refactor: move package.json to type: module

this is where the fun begins

* chore: move webpack common and prod to esm

* chore: move webpack to esm, eslint to explicit cjs

* refactor: migrate all files to esm

* style: lint

* refactor: begin moving karma to cjs, use dynamic esm import

* refactor: move index-test to cjs

* refactor: begin moving e2e to ESM

this was manual. I'm committing this because I'm about to try the `cjstoesm` tool

* refactor: move all to esm

* fix: make all e2e tests use .js imports

* refactor: begin moving exports to esm

* refactor: use URL transforms instead of __dirname

* fix: use libraryExport: default to properly handle openmct

* fix: export all playwright configs as modules

* refactor: move all instances of __dirname to import.meta.url

* refactor: lint, drop unnecessary URL call

* fix: use correct URL path on helper/addNoneditableObject.js

* fix: more incorrect URL resolve issues

* fix: parse json after reading it
2024-01-02 07:24:22 -08:00
John Hill
2a1064cbab
[CI] Stabilize visual tests, remove appAction, and update pane buttons (#7033)
* Add a VISUAL_URL constant and remove all vestiges of hide inspector and tree

* hide timer and add concurrency

* turn off concurrency

* factor out old appAction

* Add expand button to panes

* remove old slow annotations

* fix fault

* update domcontentloaded

* missed refactor

* driveby: setTimeBounds private

* add comments to the percyCSS

* suggest MISSION_TIME

* more notes

* regen

* clean up test

* driveby: clean up order

* restructure

* add new suite now that i'ts hidden

* use mission time everywhere possible

* driveby

* rerun generatedata

* comments

* lintfix
2023-09-11 23:33:46 +00:00
Jesse Mazzella
caa7bc6fae
chore: add prettier (2/3): apply formatting, re-enable lint ci step (#6682)
* style: apply prettier formatting

* fix: re-enable lint ci check
2023-05-18 21:54:46 +00:00
Jesse Mazzella
ba4353aacb
fix: Gantt Chart displays draft status of Plan in composition (#6642)
* fix: setStatus when add/replace a plan in composition

* test: add regression test

* chore: lint:fix

* test: add visual tests for plan and gantt chart drafts
2023-05-05 23:48:34 +00:00
Jesse Mazzella
968eee6698
chore: bump Playwright to v1.32.3 (#6511)
* chore: bump Playwright to v1.32.1

* test: fix locators, remove unnecessary awaits

* chore: bump Playwright in ci workflows

* test: better selectors for yAxis configs

- fix tests

* chore: bump Playwright to 1.32.3

* refactor: ensure openmct starts after plugins install

* fix: wait for domcontentloaded on initial nav

* test: fix autoscale snapshot test

* test: fix `--max-failures` argname typo

* test: update old locators

* test(fix): add missing await

* test: fix typo 😅
2023-04-18 22:32:29 +00:00
Jesse Mazzella
ff3a20e446
feat: configurable Plan Views for reducing vertical scroll distance (#6415)
* refactor: convert Type API to ES6 module

- Another AMD module bites the dust 🧹

* feat: add initial configurable plan type

- Name change TBD

* feat: add `clipActivityNames` property

- refactor: initialize data to `null`

* refactor: general code cleanup

* feat(WIP): name clipping via clipPath elements

* feat: compose a Gantt Chart using a Plan

- Allows Plans to be dragged into Gantt Charts (name tentative) to create a configurable Activity View

- Clip/Unclip activity names by editing domainObject property

* feat: replace Plan if another is dragged in

- SImilar to Gauges or Scatter Plots, launch a confirmation dialog to replace the existing Plan with another, if another Plan is dragged into the chart.

* test: fix tests, add basic tests for gantt

* tes(e2e): fix plan test

* docs: add TODO

* refactor: clean up more string literals

* style: remove `rx`, increase min width

- round widths to nearest integer

* refactor: extract timeline creation logic

- extracts the logic for creating the timeline into its own component, `ActivityTimeline.vue`. This will save us a lot of re-renders, as we were manually creating elements / clearing them on each tick

* style: fix text y-pos and don't round

* fix: make activities clickable again

* docs: add copyright docs

* feat: swimlane visibility

- configure plan view from inspector

fix: update plans when file changes

- fix gantt chart display in time strips

- code cleanup

* fix: gantt chart embed in time strip

* remove viewBox for now

* fix: make `clipPath` ids more unique

* refactor: more code cleanup

* refactor: more code cleanup

* test: fix existing Plan unit tests

* refactor: rename variables

* fix: respond to code review comments

- Move config manipulation to PlanViewConfiguration.js/.vue

- Variable renames, code refactoring

* fix: unique, reproducible clipPathIds

* fix: only mutate swimlaneVisibility once on init

* fix: really make clipPathId unique this time

* refactor: use default config

* Closes #6113
- Refined CSS class naming and application.
- Set cursor to pointer for Activity elements.
- Added <title> node to Activity elements.
- Styling for selected Activities.
- Better Inspector tab name.

* fix: make Plan creatability configurable and false by default

* test: fix existing tests and add a couple new ones

* Closes #6113
- Now uses SVG <symbol> instead of rect within Activity element.
- Passes in `rowHeight` as a prop from Plan.vue.
- SWIMLANE_PADDING const added and used to create margin at top and bottom
edges of swimlanes.
- Refined styling for selected activities.
- New `$colorGanttSelectedBorder` theme constant.
- Smoke tested in Espresso and Snow themes.

* fix: default swimlaneWidth to clientWidth

* test: fix test

* feat: display selected activity name as header

* fix: remove redundant listener

* refactor: move `examplePlans.js` into `test-data/`

* docs: remove copyright header

* refactor: move `helper.js` into `helper/`

* refactor: `helper.js` -> `planningUtils.js`

* fix: update pathing

* test: add tests for gantt/plan

- add visual tests for gantt / plan

- add test for clicking a single activity and verifying its contents in the inspector

---------

Co-authored-by: Charles Hacskaylo <charlesh88@gmail.com>
2023-03-16 10:34:31 -07:00