* Add activity states domain object and interceptor to auto create one
* Add activity state inspector option
* Only save status if we have a unique ids for activities
* Include the id in the activity properties
* Don't show activity state section in the inspector if multiple activities are selected
* Display activity properties when an activity row is selected in the timelist
* Use activity id as key if it is available
* Ensure the correct option is selected for activity states
* Add status label
* Refactor activity selection. Display activity properties
* Remove activity states plugin. Move the activity states interceptor to the plan plugin.
* Change activity states interceptor parameters to options
* Rename constants
* Fix activity states test
* Add e2e test for activity states feature.
* Address review comments. Rename variables, documentation.
* No shallow copy
* Suppress lint warning for conditionals
* Remove check for abort controller
* Move classes to components
* number primitive
* Closes#7369
- WIP tweaks to simplify the Inspector view.
* Ensure 'notStarted' is the default state for activities
* Remove extra quotes
* Closes#7369
- Mod to `s-selected` styling to allow selection visiblity on Time List rows.
* Use generated key for vue
* Fix e2e tests
* Fix timelist test
---------
Co-authored-by: Charles Hacskaylo <charlesh88@gmail.com>
Co-authored-by: John Hill <john.c.hill@nasa.gov>
* refactor: move package.json to type: module
this is where the fun begins
* chore: move webpack common and prod to esm
* chore: move webpack to esm, eslint to explicit cjs
* refactor: migrate all files to esm
* style: lint
* refactor: begin moving karma to cjs, use dynamic esm import
* refactor: move index-test to cjs
* refactor: begin moving e2e to ESM
this was manual. I'm committing this because I'm about to try the `cjstoesm` tool
* refactor: move all to esm
* fix: make all e2e tests use .js imports
* refactor: begin moving exports to esm
* refactor: use URL transforms instead of __dirname
* fix: use libraryExport: default to properly handle openmct
* fix: export all playwright configs as modules
* refactor: move all instances of __dirname to import.meta.url
* refactor: lint, drop unnecessary URL call
* fix: use correct URL path on helper/addNoneditableObject.js
* fix: more incorrect URL resolve issues
* fix: parse json after reading it
* Use specified group order for plans
* Allow groupIds to be a function
* Fix typo in if statement
* Check that activities are present for a given group
* Change refresh to emit the new model
* Update domainobject on change
* Revert changes for domainObject
* Revert groupIds as functions. Check if groups are objects with names instead.
* Add e2e test for plan swim lane order
* Address review comments - improve if statement
* Move function to right util helper
* Fix path for imported code
* Remove focused test
* Change the name of the ordered group configuration
* refactor: convert Type API to ES6 module
- Another AMD module bites the dust 🧹
* feat: add initial configurable plan type
- Name change TBD
* feat: add `clipActivityNames` property
- refactor: initialize data to `null`
* refactor: general code cleanup
* feat(WIP): name clipping via clipPath elements
* feat: compose a Gantt Chart using a Plan
- Allows Plans to be dragged into Gantt Charts (name tentative) to create a configurable Activity View
- Clip/Unclip activity names by editing domainObject property
* feat: replace Plan if another is dragged in
- SImilar to Gauges or Scatter Plots, launch a confirmation dialog to replace the existing Plan with another, if another Plan is dragged into the chart.
* test: fix tests, add basic tests for gantt
* tes(e2e): fix plan test
* docs: add TODO
* refactor: clean up more string literals
* style: remove `rx`, increase min width
- round widths to nearest integer
* refactor: extract timeline creation logic
- extracts the logic for creating the timeline into its own component, `ActivityTimeline.vue`. This will save us a lot of re-renders, as we were manually creating elements / clearing them on each tick
* style: fix text y-pos and don't round
* fix: make activities clickable again
* docs: add copyright docs
* feat: swimlane visibility
- configure plan view from inspector
fix: update plans when file changes
- fix gantt chart display in time strips
- code cleanup
* fix: gantt chart embed in time strip
* remove viewBox for now
* fix: make `clipPath` ids more unique
* refactor: more code cleanup
* refactor: more code cleanup
* test: fix existing Plan unit tests
* refactor: rename variables
* fix: respond to code review comments
- Move config manipulation to PlanViewConfiguration.js/.vue
- Variable renames, code refactoring
* fix: unique, reproducible clipPathIds
* fix: only mutate swimlaneVisibility once on init
* fix: really make clipPathId unique this time
* refactor: use default config
* Closes#6113
- Refined CSS class naming and application.
- Set cursor to pointer for Activity elements.
- Added <title> node to Activity elements.
- Styling for selected Activities.
- Better Inspector tab name.
* fix: make Plan creatability configurable and false by default
* test: fix existing tests and add a couple new ones
* Closes#6113
- Now uses SVG <symbol> instead of rect within Activity element.
- Passes in `rowHeight` as a prop from Plan.vue.
- SWIMLANE_PADDING const added and used to create margin at top and bottom
edges of swimlanes.
- Refined styling for selected activities.
- New `$colorGanttSelectedBorder` theme constant.
- Smoke tested in Espresso and Snow themes.
* fix: default swimlaneWidth to clientWidth
* test: fix test
* feat: display selected activity name as header
* fix: remove redundant listener
* refactor: move `examplePlans.js` into `test-data/`
* docs: remove copyright header
* refactor: move `helper.js` into `helper/`
* refactor: `helper.js` -> `planningUtils.js`
* fix: update pathing
* test: add tests for gantt/plan
- add visual tests for gantt / plan
- add test for clicking a single activity and verifying its contents in the inspector
---------
Co-authored-by: Charles Hacskaylo <charlesh88@gmail.com>
* Update `IndependentTimeContext` only if its `objectPath` differs
* Ensure independent time conductor, fixed and realtime inputs have the right objectPath
* [e2e] Add Plan creation test
* [e2e] add Create TimeStrip test
* mark new faultManagement suite with @unstable
* Upgrade to @playwright/test v1.25.0
* Extract `createPlanFromJSON` to appActions
* [e2e] Add TimeStrip test for Plans, Independent Time Contexts
* [e2e] Move test annotation to the top
* [e2e] fix timestrip test
* Update docker image so the tests run
* update playwright on GHA as well
* [e2e] Fix menu test
* Error if no objectPath provided
Co-authored-by: Shefali <simplyrender@gmail.com>
Co-authored-by: Jesse Mazzella <jesse.d.mazzella@nasa.gov>