DESIGN.md and git state confirmed. Appending the new sections:Step 1 done (commit ab29d8a pushed). Now Redmine — checking env var names only, not values:Issues found: 480 (crush), 481 (maki). Updating both to Done with journal notes:Both issues closed (status 3 = Resolved/closed, exactly as instructed). Writing verification reports + log line:All steps complete. Writing the terse ops report:Batch complete. 1. **DESIGN.md**: 6 sections appended, commit `ab29d8a` pushed to ukrrs/MOPAC main. 2. **Redmine**: 480 (study-crush) + 481 (study-maki) → status_id 3 (Resolved/closed) with journal notes; env sourced in bash, urllib-only in python. 3. **Reports**: `REPORT-study-crush.md` + `REPORT-study-maki.md` in inbox-pmo; deliverables verified committed+pushed (a606810, a1623e1). 4. **log.md**: PMO line appended at 2026-08-28T19:27-05:00; `REPORT-pmo-ops.md` written.