cleanup
This commit is contained in:
104
team-hweng/HwEngTooling.md
Normal file
104
team-hweng/HwEngTooling.md
Normal file
@@ -0,0 +1,104 @@
|
||||
# TSYS Group Handbook - Engineering Documentation - Team HwEng - Tooling
|
||||
|
||||
## Introduction
|
||||
|
||||
This article covers the support stack of software and hardware used by the hardware engineering
|
||||
team to develop the orbiter.
|
||||
|
||||
Topics covered by this documentation:
|
||||
|
||||
* Computer Systems
|
||||
* Dev/qa/prod systems
|
||||
|
||||
* (Custom) Hardware machines/tools for prototypes
|
||||
* Envelope Sealer
|
||||
* Inflator
|
||||
* Pressure chamber
|
||||
* Reflow Oven
|
||||
* RF Testing chamber
|
||||
* Environmental Testing - Temperature
|
||||
* Environmental Testing - UV
|
||||
|
||||
* Software
|
||||
|
||||
See the following links for the software setup guides
|
||||
|
||||
- <https://git.turnsys.com/TSGTechops/docs-techops/src/branch/master/TSYS-DevEnv-VsCode.md>
|
||||
- <https://git.turnsys.com/mrcharles/dotfiles/src/branch/master/README.md>
|
||||
|
||||
|
||||
## Computer Systems
|
||||
|
||||
* Raspberry Pi
|
||||
* subobench (all lab equipment with a digital interface is attached to this). Documented on discourse.
|
||||
|
||||
* x86 servers
|
||||
* subodev We develop workloads here. Once a day update or so. (After any needed iterations on our dev workstations)
|
||||
* suboqa We run qa/unit/integration/burn in etc tests here on all workloads. Expect once a week updates or so.
|
||||
* suboprod We run production workloads here. All things on here should be expected to come under regulatory review. May be considered a system of record, need to ponder. This is CUDA enabled (quadro). Expected to be under cluster control (slurm).
|
||||
|
||||
* Tegra cluster
|
||||
* suboprod01-05
|
||||
|
||||
## (custom) tooling for prototypes
|
||||
|
||||
### Envelope Heat Sealer
|
||||
|
||||
* Overview
|
||||
|
||||
This is used for assembling the envelopes. It's a customized heat sealer, controlled by an Arduino for precision temperature control.
|
||||
|
||||
* Bill of Materials
|
||||
|
||||
### Inflator
|
||||
|
||||
* Overview
|
||||
|
||||
This is used for inflating the envelopes once they've been assembled (in particular for leak detection).
|
||||
|
||||
It's a customized pump , controlled by an Arduino for precision pressure control.
|
||||
|
||||
* Bill of Materials
|
||||
|
||||
### Pressure chamber
|
||||
|
||||
* Overview
|
||||
|
||||
* Bill of Materials
|
||||
|
||||
### Reflow Oven
|
||||
|
||||
* Overview
|
||||
|
||||
This is used
|
||||
|
||||
* Bill of Materials
|
||||
|
||||
### Cameo Silhouette
|
||||
|
||||
* Overview
|
||||
|
||||
This is used to (primarily) make solder stencils for PCB re-work we will be doing on prototypes.
|
||||
|
||||
### RF Testing Chamber
|
||||
|
||||
We will do as much EMC testing in house as we can. This will save us 10s of thousands of dollars
|
||||
and will increase our first pass chances at the FCC certified lab immensely. We can also rent out the chamber when we aren't using it.
|
||||
|
||||
* Major components
|
||||
* Considerations/concerns
|
||||
* Budget/BoM
|
||||
|
||||
### Environmental Testing
|
||||
|
||||
We will do as much environmental testing in house as we can. Need to research if any external testing is required by regulation, but currently (03/03/2021) I'm un-aware of any that is required.
|
||||
Of course we will test extensively , for robustness etc.
|
||||
|
||||
* Major components
|
||||
* Considerations/concerns
|
||||
* Budget/BoM
|
||||
|
||||
#### UV
|
||||
|
||||
#### Extreme cold
|
||||
|
Reference in New Issue
Block a user