Add CAPACITY-GOALS.md (80% RAM / ~50% idle CPU targets + workload placement
model) and AUDIT-2026-07-29.md (live end-to-end analysis of all 7 hosts). Key
findings: memory goal met fleet-wide (highest 72%); CPU idles 0-6% (chase via
workloads, not hardware); tsys5 is single-CPU not dual; cnode4/5 are stale
running VMs. Answers the wnode-sizing question (grow tsys9, not tsys1), confirms
tsys6/7 for RackRental, and gives a DDR3 compatibility decision tree (RDIMM-only
servers reject consumer UDIMM). Refreshed STATUS/docmap and the returned audit
logs, and fixed an empty-array abort in deploy-check.sh.
💘 Generated with Crush
Assisted-by: Crush:glm-5.2
Deployed check.sh to all 7 hosts at 21:50 CDT. Captures the live state
after the user's PDM migrations:
Cnode movements since last audit:
- cnode1: tsys1 -> tsys9
- cnode2: tsys6 -> tsys7
- cnode5: tsys6 -> tsys7, storage D5(tsys4) -> S2(tsys5)
Wnode changes:
- wnode-tsys1 (102): new VM on S2, stopped
- wnode-tsys3: RAM bumped 20 -> 28 GB
- wnode-tsys6: now running (was stopped)
- wnode-tsys9: storage moved S3 -> S2
Storage distribution improved from 90/10 to 73/27 (tsys4/tsys5).
Still need 2 more cnode moves for etcd quorum survival.
Updated executive summary, k8s distribution tables, storage
utilization, and open items with the fresh data. Captured future k8s
requirements: vcluster + Rancher, OIDC to Keycloak, workload isolation
(RackRental/Suborbital ITAR/non-ITAR/SLP), and solar-aware scale-out
with PowerEdge 19xx/2950 systems.
Added tsys9 to deploy-check.sh host list.