diff --git a/docs/report-amt-power-telemetry.md b/docs/report-amt-power-telemetry.md index 7842ad8..6a6e6c3 100644 --- a/docs/report-amt-power-telemetry.md +++ b/docs/report-amt-power-telemetry.md @@ -60,8 +60,9 @@ for watts. update iDRAC6 firmware on tsys6 if DCMI commands fail. 4. tsys5 (T7500): budget a metered PDU or smart plug — no software path exists (fits the planned UPS re-cabling: put tsys5 on the metered leg). -5. tsys9: run `dmidecode -t system` + `ls /sys/class/powercap` — that pair - answers both its AMT and RAPL questions; report back. +5. tsys9 RESOLVED (2026-09-06): OptiPlex 7080, i5-10500, live PVE 9.2.5 node + (100.101.158.76 — runs pfv-netinfra-02 + k8s wnode-tsys9); RAPL present — + include it in the RAPL exporter wave. 6. UPS plan alignment: since only tsys6/7 (BMC) + RAPL hosts give per-node watts, keep the metered UPS leg feeding the gear you most need wall-watts for; per-node software telemetry covers the rest.