openwrt/target/linux/generic/pending-5.15/723-net-mt7531-ensure-all-MACs-are-powered-down-before-r.patch
John Audia 42cb0f0f26 kernel: bump 5.15 to 5.15.119
Build system: x86_64
Build-tested: x86_64/ACEMAGICIAN T8PLUS, ramips/tplink_archer-a6-v3
Run-tested: x86_64/ACEMAGICIAN T8PLUS, ramips/tplink_archer-a6-v3

Signed-off-by: John Audia <therealgraysky@proton.me>
2023-07-01 11:42:11 +02:00

38 lines
1.2 KiB
Diff

From 3fb8841513c4ec3a2e5d366df86230c45f239a57 Mon Sep 17 00:00:00 2001
From: Alexander Couzens <lynxis@fe80.eu>
Date: Sat, 13 Aug 2022 13:08:22 +0200
Subject: [PATCH 03/10] net: mt7531: ensure all MACs are powered down before
reset
The datasheet [1] explicit describes it as requirement for a reset.
[1] MT7531 Reference Manual for Development Board rev 1.0, page 735
Signed-off-by: Alexander Couzens <lynxis@fe80.eu>
---
drivers/net/dsa/mt7530.c | 6 +++++-
1 file changed, 5 insertions(+), 1 deletion(-)
--- a/drivers/net/dsa/mt7530.c
+++ b/drivers/net/dsa/mt7530.c
@@ -2422,7 +2422,7 @@ mt7531_setup(struct dsa_switch *ds)
struct mt7530_priv *priv = ds->priv;
struct mt7530_dummy_poll p;
u32 val, id;
- int ret;
+ int ret, i;
/* Reset whole chip through gpio pin or memory-mapped registers for
* different type of hardware
@@ -2454,6 +2454,10 @@ mt7531_setup(struct dsa_switch *ds)
return -ENODEV;
}
+ /* all MACs must be forced link-down before sw reset */
+ for (i = 0; i < MT7530_NUM_PORTS; i++)
+ mt7530_write(priv, MT7530_PMCR_P(i), MT7531_FORCE_LNK);
+
/* Reset the switch through internal reset */
mt7530_write(priv, MT7530_SYS_CTRL,
SYS_CTRL_PHY_RST | SYS_CTRL_SW_RST |