Due to problem with migrating from master to main as the default branch
and downstream project still requiring the master branch to be present,
we currently have for push events double CI runs, one for main and one
for master. To solve this ignore any push event to the master branch for
every workflow that react on push events.
Signed-off-by: Christian Marangi <ansuelsmth@gmail.com>
Instead of referring to a redundant job and ENV variables, rework build
workflow to accept and require split target and subtarget and use them
directly from inputs.
Rework each user and pass a JSON of tuple to matrix include with each
target/subtarget combination to test. Special notice this doesn't use
the github actions matrix combination feature but reference each
specific tuple of target and subtarget to test.
Just a cleanup no behaviour change intended.
Signed-off-by: Christian Marangi <ansuelsmth@gmail.com>
Add concurrency limits for pull request test so that on pull request
refresh old jobs are cancelled.
The group is created based on the github ref + workflow name and the
workflow is cancelled only it it comes from a pull_request event.
Push events are not affected by this limit.
Signed-off-by: Christian Marangi <ansuelsmth@gmail.com>