Add concurrency limits for pull request test so that on pull request
refresh old jobs are cancelled.
The group is created based on the github ref + workflow name and the
workflow is cancelled only it it comes from a pull_request event.
Push events are not affected by this limit.
Signed-off-by: Christian Marangi <ansuelsmth@gmail.com>
Since kernel and packages workflow now use a shared build workflow, they
also need to react on changes on these shared workflow.
Fix this and add these shared workflow to the event paths to check.
Signed-off-by: Christian Marangi <ansuelsmth@gmail.com>
Extract the building of OpenWrt into an own workflow which is then
triggered by the kernel.yml and packages.yml workflow with different
inputs. This allows us to share much of the code of the workflow.
Signed-off-by: Hauke Mehrtens <hauke@hauke-m.de>
Activate CONFIG_AUTOREMOVE to match the settings used to build the
pre-build tools. This has to match the pre-build tools to not rebuild
them.
This prevents the tools being rebuild in packages.yml.
Signed-off-by: Hauke Mehrtens <hauke@hauke-m.de>
This will build OpenWrt for MIPS malta BE and x86 64 Bit with all
packages and kernel modules activated. It is triggered when something
changes in the build system or when a package definition is changed.
This task probably needs 90 minutes to execute, but I hope that it
will find build problems in pull requests early.
This intentionally does not activate the feeds, because building them
too would take too long. We only build x86/64 and malta/be to save
resources.
I would like to detect build problems when a package is changed. We
often had build breaks when a package version was increased sometime
even in other packages which used it as a dependency.
This is based on the .github/workflows/packages.yml workflow.
Signed-off-by: Hauke Mehrtens <hauke@hauke-m.de>