openmct/platform/features/timeline/res/templates/resource-graphs.html
Pete Richards 49560698f6 [Reorg] Make timeline-specific chart directive
Make a separate chart directive for drawing resource graphs in timelines.  This
is in preparation for a new plot bundle which will make a large number of
changes to the drawing API to support newly requested features.  By separating
code, there will be no impact to the timeline when the new plot features are
added.
2017-01-17 09:59:00 -08:00

35 lines
1.5 KiB
HTML

<!--
Open MCT, Copyright (c) 2009-2016, United States Government
as represented by the Administrator of the National Aeronautics and Space
Administration. All rights reserved.
Open MCT is licensed under the Apache License, Version 2.0 (the
"License"); you may not use this file except in compliance with the License.
You may obtain a copy of the License at
http://www.apache.org/licenses/LICENSE-2.0.
Unless required by applicable law or agreed to in writing, software
distributed under the License is distributed on an "AS IS" BASIS, WITHOUT
WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied. See the
License for the specific language governing permissions and limitations
under the License.
Open MCT includes source code licensed under additional open source
licenses. See the Open Source Licenses file (LICENSES.md) included with
this source code distribution or the Licensing information page available
at runtime from the About dialog for additional information.
-->
<span ng-controller="TimelineGraphController as graphController">
<div class="t-graph l-graph" ng-repeat="graph in parameters.graphs">
<div class="l-graph-area l-canvas-holder">
<mct-timeline-chart draw="graph.drawingObject"></mct-timeline-chart>
</div>
<div class="t-graph-labels l-graph-labels">
<mct-include key="'timeline-resource-graph-labels'"
parameters="graphController.label(graph)"
ng-model="graph">
</mct-include>
</div>
</div>
</span>