* d3 implementation of progress pie chart
* Handle 0% and 100% cases
* PR #7485
- Minor tweaks to `s-selected` styling.
* add in-progress class for compact view
* Fix issue where updating progress for pie chart wasn't working till at least one clock tick.
Write tests for progress pie
* update documentation for clock annotation
* Update clock annotation in tests
* split long testfile
* driveby missing test
* driveby fix flake
* temp: fix flake and prep for visual test
* Fix linting errors
* this should be resolved
* these keep popping up
* moving some of this around
* moving this around
* the test
* Fix imports for tests
* no longer need constant
* move to front
* Stabalize name
* test(missionStatus): fix visual test
---------
Co-authored-by: Charles Hacskaylo <charles.f.hacskaylo@nasa.gov>
Co-authored-by: Jesse Mazzella <ozyx@users.noreply.github.com>
Co-authored-by: John Hill <john.c.hill@nasa.gov>
Co-authored-by: Andrew Henry <akhenry@gmail.com>
Co-authored-by: Jesse Mazzella <jesse.d.mazzella@nasa.gov>
* refactor: move package.json to type: module
this is where the fun begins
* chore: move webpack common and prod to esm
* chore: move webpack to esm, eslint to explicit cjs
* refactor: migrate all files to esm
* style: lint
* refactor: begin moving karma to cjs, use dynamic esm import
* refactor: move index-test to cjs
* refactor: begin moving e2e to ESM
this was manual. I'm committing this because I'm about to try the `cjstoesm` tool
* refactor: move all to esm
* fix: make all e2e tests use .js imports
* refactor: begin moving exports to esm
* refactor: use URL transforms instead of __dirname
* fix: use libraryExport: default to properly handle openmct
* fix: export all playwright configs as modules
* refactor: move all instances of __dirname to import.meta.url
* refactor: lint, drop unnecessary URL call
* fix: use correct URL path on helper/addNoneditableObject.js
* fix: more incorrect URL resolve issues
* fix: parse json after reading it
* refactor: convert to ES6 function
* fix: include `keyString` in event name
- This negates the need for complicated logic in determining which objectView the action was intended for
* fix: handle the case of currentView being null
* fix: add keyString to flexibleLayout toolbar events
* fix: properly unregister listeners
* fix: remove unused imports
* fix: revert parameter reorder
* refactor: replace usage of `arguments` with `...args`
* fix: add a11y to display layout + toolbar
* test: add first cut of layout toolbar suite
* test: cleanup a bit and add Image test
* test: add stubs
* fix: remove unused variable
* refactor(DisplayLayoutToolbar): convert to ES6 class
* test: generate localStorage data for display layout tests
* fix: clarify "Add" button label
* test: cleanup and don't parameterize tests
* test: fix path for recycled_local_storage.json
* fix: path to local storage file
* docs: add documentation for
utilizing localStorage in e2e
* fix: path to recycled_local_storage.json
* docs: add note hyperlink
* Add a VISUAL_URL constant and remove all vestiges of hide inspector and tree
* hide timer and add concurrency
* turn off concurrency
* factor out old appAction
* Add expand button to panes
* remove old slow annotations
* fix fault
* update domcontentloaded
* missed refactor
* driveby: setTimeBounds private
* add comments to the percyCSS
* suggest MISSION_TIME
* more notes
* regen
* clean up test
* driveby: clean up order
* restructure
* add new suite now that i'ts hidden
* use mission time everywhere possible
* driveby
* rerun generatedata
* comments
* lintfix