Commit Graph

6 Commits

Author SHA1 Message Date
Felipe Lalanne
0fb1de2a1a Migrate tests for image manager 2022-09-28 10:37:41 -03:00
Felipe Lalanne
b81294431e Migrate compose/app and compose/app-manager tests
compose/app is run as part of the unit test suite
compose/application-manager is run as part of the integration test suite
2022-09-28 10:37:41 -03:00
Felipe Lalanne
a69fbf6eac Migrate volume-manager tests to integration
Now the tests are ran against the actual docker engine instead of
against mockerode.

The new tests actually caught a bug in
`volumeManager.removeOrphanedVolumes`, where that function would try to
remove volumes for stopped containers, causing an exception.
This commit also fixes that bug.
2022-09-28 10:37:41 -03:00
Felipe Lalanne
a5a24e6462 Split compose/service tests into unit/integration 2022-09-28 10:37:41 -03:00
Felipe Lalanne
cdc9868d29 Split compose/network test in unit/integration
Integration tests are ran in the engine instead of mockerode.
2022-09-28 10:37:40 -03:00
Felipe Lalanne
4113dde45d Split compose/volume tests into unit/integration
This also needs to modify the test environment as database migrations
will look for `config.json` in the location given by the variable
`CONFIG_MOUNT_POINT`.

The volume tests now run against the actual docker engine setup via dind

Change-type: patch
2022-09-28 10:37:40 -03:00